Khlong Luang Rachalothorn Reservoir Project Initiated by His Majesty the King

Construction Project for Large Scale Irrigation 8

Bureau of Large Scale Water Resources Development,

Royal Irrigation Department,

Ministry of Agriculture and Cooperatives

The Initiative of His Majesty the King

          On May 12, 1982, His Majesty the King spoke about Irrigation works at Chitralada Royal Villa that…

          “Khlong Luang Rachalothorn Reservoir has capacity of 110 million cubic metres. Royal Irrigation Department will construct Khlong Luang dam at 47 PQQ

546 - 804 Map Scale 1: 50000 Map sheet 4235. And it has system to distribute water from the reservoir directly to agriculture area about 32,000 rai (5,120 hectares) as planned. The main purpose of this project was planned to save the budget and save time for construction as well as not only to solve water shortage problem but also to relieve flood in rainy season.

Project History

          1. Since 1965, Royal Irrigation Department planned to construct Khlong Luang Reservoir Project.

          2. In 1989, Khlong Luang Reservoir Project is 1 of 12 projects that the cabinet had approved

 to develop water resources project in Upper Bang Pa Kong River and tributaries. 

          3. On September 29, 1992, Royal Irrigation Department has hired a southeast Technology 

Co.,ltd. And Macro Consultant Co.,Ltd. to conduct a feasibility study and environmental impact assessment of Khlong Luang Reservoir Project. The project completed in May 1995.

          4. National Environmental Board had approved EIA report on October 31, 2008.

          5. The Cabinet passed a resolution on April 28, 2009, to implement Khlong Luang Reservoir

       project in Chon Buri Province in 2010.

          6. The Cabinet passed a resolution on July 21, 2015, to approve in principle on increase in the budget of Khlong Luang Reservoir project, Chon Buri Province from 6,700 million baht to 9,341,364 baht and extend the duration of project implementation from 7 years  (2010-2016) to 10 years (2010-2019).

Project Advantages

          1. Increasing irrigable area in the rainy season along the canal, covering 44,000Rai (7,040 hectares), two districts; Kho Chan and Phanat Nikhom in total 11 sub-districts.

              1.1 Tha Bunmee and Koh Chan sub-districts, Koh Chan District

              1.2 Na Reuk, Na Wang Hin, Ban Chang, Nong Hieang, Nong Prue, Wat Luang, Hua Thanon, Rai Lak Thong, Khok Ploa sub-districts, Phanat Nikhom district

          2. Consumption, Industrial, Livestock, and Ecological

          3. Prevention and alleviation flood in Phan Thong, Phanat Nikhom, and Koh Chan district, Chon Buri Province.

          4. Tourism

          5. Fisheries and Aquatic Animals breeding

Project Map


Map showing location of Klong Luang Reservoir and its Command Area

Project Implementation Plan and Result of the Project

The progress of Khlong Luang Rachalothorn Reservoir Project

          1. Construction of Head works, appurtenant structures, and other components

Construction completed 100%

          2. Construction of Right Distribution Canals and Drainage Canals with appurtenant structures.

Concrete lining of Main Distribution Canal

Concrete lining of Main Distribution Canal

Contract No.  กจ 25/56 (กสพ.2)

September 12, 2013 (630 days)

Contract Start on November 15, 2013 and expire on August 6, 2015

Budget 387,700,000 Baht (11 million U$)

Currently, the Department approved the extension of the additional 367-day contract period ended on August 7, 2016.

The progress on March 31, 2016

       Project Plan   :    61.22   %

       Completed     :    21.90   %

       Delay             :    39.32   %

          3. Construction of Left Distribution Canals and Drainage Canals with appurtenant structures

                    Main Distribution Canal (LMC), length is 31.29 km, is during design process.

                     6 Lateral Canal is during the surveying process.

Map of Left Distribution Canals; Irrigated Area 16,915 Rai (2,706 ha)

          4. Road

 

The road around reservoir phrase 1 is 8.77 km in length.

Contract No.  จส 3/58 (กสพ.)  December 2, 2014 (210 days)

Contract Start on December 16, 2014 and expire on July 13, 2015

Budget 49,500,000 Baht (1.4 million U$)  The project Completed

The road around reservoir phrase 2 In fiscal year 2016, construction budget was not allocated.

Water Management Between 2013 – 2015

          Storing water for flood mitigation in 2013

          During September and October 2013, occurrence heavy rains in a wide area in eastern part of Thailand. There was heavy rain in Chanthaburi province, as a result rainfall flows into the Khlong Luang reservoir in a large volume and continuously. At that time, downstream of Koh Chan, Phanat Nikhom, and Phan Thong districts, Chon buri Province a large amount of accumulated rainfall and caused inundated in some areas. Royal Irrigation Department was planning on decreased water from Khlong Laung reservoir, which is under construction; to reduce the impact on the main dam construction which has not been completed. And maintain water level in reservoir in order not to have a high level and flooded into the land of people who did not received the land compensation. RID has managed water storage in the Khlong Laung reservoir by supported volume of water at 70 million cubic meters in order not to affect the flooding in Phan Thong and Phanat Nikhom districts which will effect transportation, agricultural area, communities area, and major economics area in Chon buri Province.

image014

Accelerate Main dam construction for storing water

1381035758.jpg

Flooded in Phanat Nikhom District, in October 2013

          Storing water for flood mitigation in 2014

          In 2014, Khong Laung Reservoir under the supervision of Bang Pakong O&M project, established the Water User Group (WUG) and it can distribute water on farm to agriculture area about 35,503 rai (5,680 ha). It’s also distributing water for supporting water supply, water consumption for 280 household, and 1 for government office.

       
   

            

             Storing water for flood mitigation in 2015

             In 2015, during September 2015 to October 2015, there was heavy rain causing water flowed into reservoir until at the full storage capacity at 98 mcm and the rest of water flowing out through the spillway.

       
   

 

          Storing water for flood mitigation in 2015

          For the end of Khlong Luang reservoir also had a large volume of water, so RID officers from Bang Pakong O&M project, Chon buri Provincial Irrigation Office and Construction Project for Large Scale Irrigation 8 went into the area to monitor the amount of water at the end of the reservoir for planning to manage the water.

       
 
   
 


          After the water situation went to normal conditions in November 2015, Bang Pakong O&M project had a meeting with WUG to allocated water for agricultural area and for water consumption in total 35000 rai (5,600 ha).

 

เอกสารเผยแพร่และประชาสัมพันธ์

รายละเอียดโครงการอ่างเก็บน้ำคลองหลวง รัชชโลทร อันเนื่องมาจากพระราชดำริ

1. ข้อมูลสรุปรายละเอียดโครงการอ่างเก็บน้ำคลองหลวง รัชชโลทร อันเนื่องมาจากพระราชดำริ คลิ๊กที่นี่

2. หนังสือที่ระลึกในโอกาส พระบาทสมเด็จพระปรมินทรมหาภูมิพลอดุลยเดช ทรงพระกรุณาโปรดเกล้าโปรดกระหม่อมให้ สมเด็จพระเทพรตนราชสุดาฯ สยามบรมราชกุมารี เสด็จพระราชดำเนินแทนพระองค์ไปทรงเปิดโครงการอ่างเก็บน้ำคลอหลวง รัชชโลทร อันเนื่องมาจากพระราชดำริ จังหวัดชลบุรี เมื่อวันที่ 28 มกราคม 2559 คลิ๊กที่นี่

เอกสารคู่มือระบบคำนวญราคากลางงานก่อสร้างของทางราชการ

คู่มือระบบการคำนวณราคากลางงานก่อสร้างงานชลประทาน doc dl icon
คู่มือระบบการคำนวณราคากลางงานก่อสร้างงานอาคาร doc dl icon
คู่มือระบบการคำนวณราคากลางงานก่อสร้างงานทางสะพาน และท่อเหลี่ยม doc dl icon

ผู้บริหาร

WONGPAN

นายวงศ์พันธ์  วงศ์สมุทร
ผู้อำนวยการสำนักงานก่อสร้างชลประทานขนาดใหญ่ที่ 8

ban05

สารบัญอิเล็ก

procurement

ridbid

GFMISheader2

intranetrid

 


ban ridban lsp     ban Mail      ban saraban  ban water 


       ban km  BAN KM LSP  KM LSP08 2FB LSP08 2   


หน่วยงานในสังกัด สพญ.

หน่วยงานสังกัดกรมชลประทาน

พยากรณ์อากาศ

สถิติการเยี่ยมชมเว็บไซต์

236327
วันนี้
เมื่อวาน
สัปดาห์นี้
เดือนนี้
รวมทั้งหมด
119
91
305
775
236327